Interior of a manufacturing plant with industrial machinery
Manufacturing software in Tijuana

The workweek loses eight hours. Output doesn't.

The workweek loses eight hours. Output doesn't.

Between 2027 and 2030, Mexico's legal workweek drops from 48 to 40 hours with no reduction in pay. Plants in Tijuana have four years to produce the same in less time. We build the software that closes that gap.

The problem isn't technological, it's arithmetic

A plant running 48 hours a week today will run 40 in 2030, with the same payroll and the same delivery commitments. Fernando Becerra, president of Arhitac, estimates the change implies roughly a 20% increase in operating cost. There are three ways to absorb it: hire more people, lose output, or make each hour count for more. The first two are expensive or unacceptable.

The third almost always starts in the same place, and it isn't the production floor — it's the administrative layer around it. The shift report someone keys into Excel by hand, the spreadsheet holding everything the ERP couldn't model, the email chain moving one approval across three departments, the inventory reconciled every Friday. That work consumes hours from engineers and supervisors who aren't on the line, and it's exactly the kind of process you can automate without touching a single machine.

That's where we work. We don't replace your ERP or your MES — we build the software that's missing around them.

Person working on a factory production floor

The schedule, year by year

The constitutional reform cuts the maximum workweek by two hours a year. According to Mexico's Ministry of Labor, each step takes effect on January 1 of its year, with no reduction in salary or benefits.

  1. 2026

    48 h

    Preparation year. The maximum workweek doesn't change yet.

  2. 2027

    46 h

    First two-hour reduction.

  3. 2028

    44 h

    Second reduction.

  4. 2029

    42 h

    Third reduction.

  5. 2030

    40 h

    Target workweek. Overtime counts from hour 41 onward.

Note: the decree amends Article 123 of the Constitution, but the implementing rules in the Federal Labor Law were still being finalized as this was written. The schedule above is the one published by the Ministry of Labor; confirm the operational details with your legal team before redesigning shifts.

Industry context in Baja California

Figures from primary sources, each one linked. Where a number is an estimate rather than a census, we say so.

11.8%

of all IMMEX manufacturing employment in Mexico sits in Baja California — the country's third state, behind Nuevo León and Chihuahua

INEGI, IMMEX bulletin

~20%

estimated increase in operating cost from the workweek reduction, according to Tijuana's industry HR association

Arhitac, via El Imparcial (Oct 2026)

85%

of the Tijuana companies Arhitac surveyed already use AI in some process; around 40% are about to open related positions

Arhitac, via El Imparcial (Sep 2026)

nearly 100%

of those same companies have not cut headcount from adopting AI — automation here is covering hours, not replacing people

Arhitac, via El Imparcial (Sep 2026)

What we build for a plant

Custom software that lives around the systems you already run. None of it requires changing your ERP or touching floor control.

Integrations between systems that don't talk

The corporate ERP, the floor system and the spreadsheets filling the gaps are rarely connected, and someone pays for that in manual data entry. We build the integrations and APIs that move each figure once.

Internal applications that replace Excel and paper

Quality checklists, shift reports, tool control, permits and approvals. Processes that work in spreadsheets until the plant grows and they stop working, turned into applications with real history and permissions.

Real-time operations dashboards

Visibility into production, scrap, downtime and compliance, reading from the systems you already have instead of asking someone to assemble the report. Especially useful when US headquarters needs the same number the plant is looking at.

Shift planning under the new workweek

Tools to model shift scenarios against the reduction schedule, compare coverage and cost, and document hours in an auditable way. Redesigning shifts is your decision; we provide the instrument for making it with numbers.

AI agents for document-heavy processes

Orders, invoices, quality certificates, customs documentation. Automatic extraction, classification and entry of documents someone transcribes by hand today. It's the use case with the fastest return and the lowest operational risk.

Portals for headquarters and customers

Controlled access to status, metrics and documentation for the corporation, the customer or the auditor, without email chains or files shared over WhatsApp.

What we don't do, so we don't waste your call

We're a software development company in Tijuana. That proximity is real and it helps — a plant visit is a drive, not a flight — but there are things we are not, and we'd rather say them here than in the second meeting.

  • We don't sell or implement a licensed MES. If what you need is an off-the-shelf MES, a specialized integrator will serve you better than we will.
  • We don't touch PLCs, SCADA, robotics or floor control. Industrial automation is a different discipline and we don't practice it.
  • We hold no ISO 13485 certification and have no experience with 21 CFR Part 11 validation. If your software needs validating for a regulated medical device, we are not the right vendor today.
  • Our portfolio is web platforms, SaaS and internal tools — we don't have a published manufacturing case yet. What we offer is the software practice applied to this context, not years on a production floor.

Frequently asked questions

See all servicesHow nearshore engagements work

Photographs: Homa Appliances, EqualStock — Unsplash

Let's talk about one concrete process

Free initial technical assessment. Response in under 24 hours.